The new bridge has a cable-stayed design. With clearance of 205 feet over the water, the new bridge is able to accommodate all cargo ship traffic. The signature bridge for Southern California has three lanes in each direction plus safety lanes, it is wider and better able to serve the current traffic needs.
Long Beach, CA
2013
© 2024 American Sheet Metal - All Rights Reserved