GERALD DESMOND
BRIDGE

The new bridge has a cable-stayed design. With clearance of 205 feet over the water, the new bridge is able to accommodate all cargo ship traffic. The signature bridge for Southern California has three lanes in each direction plus safety lanes, it is wider and better able to serve the current traffic needs.

LOCATION

Long Beach, CA

 

CONTRACT DATE

2013

OVERVIEW

  • BRIDGE DRAINAGE
  • PIPE HANGER SYSTEM
  • EXPANSION COUPLER FITTING
  • CABLE RAILINGS
  • ISO CASING COVERS

 

PARTNERED WITH

PHOTO GALLERY

LET'S TALK ABOUT YOUR PROJECT