Construction of a new rest stop building and various design aspects including finshing materials, fencing and modern design elements placed around the rest stop.

LOCATION

Los Angeles, California

CONTRACT DATE

2013

Architectural Metals

Route 1-5/134 Separation

The project included the construction of 2.2 miles of High Occupancy Vehicle (HOV) lanes, one lane in each direction of travel along I-5 between Magnolia Avenue and Cohasset Street undercrossing, the modification of the Empire Avenue interchange to a full diamond interchange, the realignment and elevation of the railroad adjacent to the freeway, and a railroad grade separated crossing at Buena Vista Street. In addition, the Burbank Blvd overcrossing was reconstructed with part of the freeway re-aligned and the Burbank Blvd on and off-ramps modified.

LOCATION

Ventura, CA

 

CONTRACT DATE

2013

OVERVIEW

  • Bridge Drainage 

  • Miscellaneous metals 

PARTNERED WITH

PHOTO GALLERY