ASM Industries, in collaboration with Security Paving, undertook a significant infrastructure project in Burbank, California.
The goal was to enhance safety and traffic flow by relocating the existing Burbank Bridge 125 feet to the west of its original position. This aimed to straighten the freeway alignment, thereby improving visibility for drivers and meeting modern safety and capacity standards.
The execution of the Burbank Bridge project involved meticulous planning and collaboration between ASM Industries and Security Paving. Key steps included:
Site Assessment and Planning: Comprehensive studies were conducted to understand the impact of the bridge relocation on traffic flow and safety. This included assessing the best position for the new bridge to achieve the desired improvements.
Design and Engineering: Innovative engineering solutions were developed to ensure the new bridge could be smoothly integrated into the existing infrastructure while meeting all safety standards.
Construction: The construction phase was carried out with minimal disruption to existing traffic. Advanced construction techniques were employed to ensure the new bridge was sturdy, safe, and capable of handling current and future traffic volumes.
Finalization and Testing: Upon completion, rigorous testing was conducted to ensure the bridge met all safety and capacity standards before it was opened to the public.
The relocation and upgrade of the Burbank Bridge resulted in several positive outcomes:
The Burbank Bridge project is a testament to ASM Industries’ commitment to improving infrastructure and enhancing safety. Through strategic planning, innovative engineering, and effective execution, ASM Industries has successfully delivered a project that will benefit the Burbank community for years.